Skip to content

Oil & Gas

Ras Tanura Risk Mitigation Package 3 — Civil and E&I

Ras Tanura, Saudi Arabia

Civil and E&I works on Risk Mitigation Package 3 at Ras Tanura — brownfield upgrades inside Saudi Aramco’s terminal and refining estate.

Ras Tanura Risk Mitigation Package 3 — Civil and E&I

Overview

Project notes

Client
Saudi Aramco
Location
Ras Tanura, Saudi Arabia
Sector
Oil & Gas
Scope
Civil and E&I works, Risk Mitigation Package 3

Project Story

Narrative

Ras Tanura is one of Saudi Aramco’s principal terminal and refining locations. Risk Mitigation Package 3 is a brownfield upgrade: civil and electrical & instrumentation works intended to reduce operating risk on an existing facility, not to build a new one beside it.

That means working inside live plant, with limited access and a defined scope. Civil works have to land without undermining existing structures. E&I has to tie into systems that remain in service. TSME executes both under Aramco site controls, with a single inspection trail.

The package is delivered as mitigation work should be: complete, documented, and usable by the plant the day it is handed over.

Begin the Conversation

Ready to start your project?

Speak with our team for a focused consultation.